A-A-51371
Insert patient end of the tube in water and continue to pump until after water is overflowing. There shall still be a negative pressure at the patient end of the tube while pumping and water is overflowing.
Following the manufacturers’ instructions, empty the full collection container and have back in operation, allowing a maximum of 15 seconds from last stroke before emptying to first stroke after emptying.
Resuscitator Performance. Each test herein shall be performed twice, once in ambient temperature for 5oF (± 5o) and humidity of 10 percent (± 5 percent) after standing in 5oF temperature for 3 hours, and once in ambient temperature 115oF (± 5oF) and humidity of 90 percent (± 5 percent) after standing in 115oF temperature for 3 hours.
A single one-handed pump stroke shall displace the volume of air as specified.
The bag shall fully recover to its relaxed size and shape in not more than 1 second upon being released from the above stroke.
While being operated at a rate to produce an airflow of 15 LPM, a running test of valve ports pressure/negative pressure shall determine that the non-rebreathing valve does not allow rebreathing of exhausted air directly from the bag, and that all valves are operating smoothly and as intended.
The unit shall be operated in conjunction with an oxygen source. The low and high supplementary oxygen concentration shall be as specified.
The unit shall be fully disassembled. Attempts shall be made to assemble the unit incorrectly. No part shall be capable of assembly in a wrong location or incorrectly at its proper location.
The unit shall be measured and weighed to verify conformance with specifications.
Aging. Durability test shall be performed as specified.
Unit. Each (EA). One rescue breathing set, as specified, constitutes one unit.
Contractor certification. The contractor shall certify and maintain substantiating evidence that the product offered meets the salient characteristics of this Commercial Item Description, and that the product conforms to the producers’ own drawings, specifications, standards, and quality assurance practices. The government reserves the right to require proof of such conformance prior to first delivery and thereafter as may be otherwise provided for under the provisions of the contract.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business