COMMERCIAL ITEM DESCRIPTION A-A-51595
Quality Assurance Provisions.
Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contact or purchase order, the contractor may use his own or any facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
Records. Records of examinations and tests performed by or for the contractor shall be maintained by the contractor and made available to the Government upon the Government’s request, at any time, or from time to time, during the performance of the contract and for a period of three years after delivery of the supplies to which such records relate.
Inspection. Inspection, as used herein, is defined as both examination (such as visual or auditory investigation without the use of special laboratory appliances or procedures) and testing (determination by technical means of physical and chemical properties) of the item.
Certificates of quality. Certificate of quality, supplied by the manufacturer of the materials, may be furnished in lieu of actual performance of such testing by the contractor, provided lot identity has been maintained and can be demonstrated to the Government. The certificate shall include the name of the contractor, the contract number, the name of the manufacturer or supplier, the NSN, the item identification, the name of the component/material, the lot number and the lot size.
Sampling for tests. Sampling for tests shall be in accordance with MIL-STD105; inspection level S-1 and acceptance number zero. Unit of product for tests purposes shall be one catheter.
Tests. Tests shall be conducted to determine compliance with specification requirements. Where feasible, the same sample shall be used for the determination of two or more test characteristics.
Contractor certification. The contractor shall certify that the product offered meets the salient characteristics of this description and conforms to the producers’ own drawings, specifications, standards, and quality assurance practices. The Government reserves the right to require proof of such conformance prior to first delivery and thereafter as may be otherwise provided for under the provisions of the contract.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business